South Transept Development
So let us not grow weary in doing what is right, for we will reap at harvest time, if we do not give up. Galatians 6:9 NRSV
This is your weekly update on how things are progressing with our developments to the south transept. New updates will be posted here each week on Saturday evening.
We now have a partition in church! Workmen built this wooden wall on Monday 19th and it’s here to protect the church from disruption caused by the building work on the other side. We aren’t allowed to enter the south transept now but these poster updates will show pictures of what’s happening, so that we can all see how things are progressing.
On Monday 26th, workmen will be taking down the old toilet and kitchen block. Once that has been removed, work will start on a new floor for the whole of the south transept.
Light oak floorboards will cover all of the area shown by brown lines in the drawing below and our new toilets and kitchen area will be clad in light oak, tongue and groove panels. Our new, hard wearing, serving area worktop will be made in a colour that matches the surround of our stained glass windows. You can see samples of all these materials in the pictures, below.